Skip to content

Contact Textile Machinery Sourcing

Textile Machinery Sourcing is an independent sourcing partner. No street address, switchboard number or public map pin is on file, so none is published. The illustration is a mill-layout sketch for RFQ orientation, not a claimed office location. Use the ledger, then the form, to request factory quotes. Submission starts a discussion; it does not place an order or reserve spindle positions.

Schematic of a spinning bay with ring frames, creel and control cabinets

Address

Not published. Destination for freight and SAT is collected in the requirement field, not as a storefront pin.

Email and phone

No public inbox or phone is listed in brand records. Work email and optional phone on the form are the return path for this inquiry.

Review window

Inquiries are reviewed on US business days. There is no claim of a monitored 24-hour desk or an on-site showroom.

Social channels

No social accounts are published for this service. Do not treat third-party marketplace listings as this site's identity.

  • Equipment and process: fiber blend, staple length, yarn count (Ne), twist (T/m), requested spindle speed (rpm) with yarn conditions, which preparation and winding stages are included, three-phase supply, connected load kW, footprint, PLC interface, mill climate and extraction.
  • Quantity and destination: machine or spindle count, US state or ZIP, requested delivery window and whether FAT witness is required.
  • Utilities and delivery window: compressed air, cooling water if applicable, optional budget (currency, per-unit or whole-order) and supplier preference (premium / mid-range / budget-friendly / not sure). Preference is a buyer selection, not a verified factory rating.

Prepare your equipment enquiry

Include process, material, operating conditions and delivery destination. Budget and supplier tier preference are optional. Mark unknowns instead of guessing Ne or rpm. Describe drawings by revision in the requirements box; this form has no upload control. We clarify open questions, circulate a consistent brief to factories and return comparable quotations. Engineering acceptance remains between you and the equipment supplier. No existing quotation is required to start.